Assessment Year | 2005 |
---|---|
Principal Product | Aluminium Architectural Products |
NAICS | 331318: Other Aluminum Rolling, Drawing, and Extruding |
SIC | 3354: Aluminum Extruded Products |
Sales Range | $50 M to 100M |
# of Employees | 409 |
Plant Area |
775,000
ft2
|
Annual Production | 12,441
ton
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,568,182 | 17,119,115 |
kWh
|
$0.092 |
Natural Gas | $1,092,427 | 127,201 |
MMBtu
|
$8.59 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $423,591 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $114,350 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $116,700 | $90,000 | - |
$116,700
-
MMBtu
|
|
02 | 2.2314: Replace heat treating oven with more efficient unit | $84,900 | $37,500 | - |
$84,900
-
MMBtu
|
|
03 | 2.1133: Adjust burners for efficient operation | $62,800 | $36,000 | - |
$62,800
-
MMBtu
|
|
04 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $40,800 | $110,000 |
$40,800
1,082,400
kWh
|
- | |
05 | 2.1231: Establish burner maintenance schedule for boilers | $4,041 | $1,500 | - |
$4,041
-
MMBtu
|
|
06 | 2.4314: Use synthetic lubricant | $4,865 | - |
$4,865
129,070
kWh
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $38,800 | $12,500 |
$38,800
1,029,000
kWh
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $58,229 | $69,592 |
$58,229
1,541,598
kWh
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,456 | $39,000 |
$12,456
330,400
kWh
|
- | |
TOTAL RECOMMENDED | $423,591 | $396,092 |
$155,150
4,112,468
kWh
|
$268,441
-
MMBtu
|
||
TOTAL IMPLEMENTED | $114,350 | $121,092 |
$114,350
3,030,068
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs