ITAC Assessment: SD0600
ITAC logo
ITAC Assessment: SD0600
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Metal Fabrication Parts
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $1
M
to 5
M
# of Employees 15
Plant Area 10,000
ft2
Annual Production 4,500
units
Production Hrs. Annual 2,210
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,867 359,640
kWh
Electricity Demand $31,584 2,135
kW-mo/yr
Electricity Fees $1,805 -
TOTAL YEARLY COSTS $82,256
RECOMMENDED SAVINGS* $82,887 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,080

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 3.1192: Reduce scrap production $80,293 $41,423 $4,293
31,591
kWh
- $57,000 $19,000 -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,211 $2,620 $746
5,491
kWh
$441
-
kW-mo/yr
- - $24
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $869 $450 $671
4,937
kWh
$198
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $514 $520 $514
3,785
kWh
- - - -
TOTAL RECOMMENDED $82,887 $45,013 $6,224
45,804
kWh
$639
-
kW-mo/yr
$57,000 $19,000 $24
TOTAL IMPLEMENTED $2,080 $3,070 $1,417
10,428
kWh
$639
-
kW-mo/yr
- - $24
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs