ITAC Assessment: OR0353
ITAC logo
ITAC Assessment: OR0353
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Rotary Hydraulic Actuators
NAICS
n/a
SIC 3593: Fluid Power Cylinders and Actuators
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 117,000
ft2
Annual Production 24,508
pieces
Production Hrs. Annual 5,408
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $148,507 3,014,654
kWh
Electricity Demand $40,938 95,712
kW-mo/yr
Electricity Fees $17,539 -
Natural Gas $16,398 3,748
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,281 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,535

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,608 $800 $2,079
41,618
kWh
$529
-
kW-mo/yr
- -
02 2.3212: Optimize plant power factor $1,927 $5,600 - - $1,927 -
03 2.8112: Combine utility meters $6,746 $20,000 - - - $6,746
TOTAL RECOMMENDED $11,281 $26,400 $2,079
41,618
kWh
$529
-
kW-mo/yr
$1,927 $6,746
TOTAL IMPLEMENTED $4,535 $6,400 $2,079
41,618
kWh
$529
-
kW-mo/yr
$1,927 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs