Assessment Year | 2022 |
---|---|
Principal Product | Car Carpets and Plastics |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $1 M to 5M |
# of Employees | 320 |
Plant Area |
261,000
ft2
|
Annual Production | 4,100,000
units
|
Production Hrs. Annual | 6,578
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,082,198 | 14,370,409 |
kWh
|
$0.075 |
Electricity Demand | $20,638 | 3,800 |
kW-mo/yr
|
$5.43 |
Electricity Fees | $114,279 | - |
|
- |
Natural Gas | $85,721 | 6,149 |
MMBtu
|
$13.94 |
TOTAL YEARLY COSTS | $1,302,836 | |||
RECOMMENDED SAVINGS* | $128,710 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $125,137 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $89,160 | $80,028 |
$70,954
942,161
kWh
|
$9,836
-
kW-mo/yr
|
$8,370 | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $9,505 | $1,000 |
$7,295
96,868
kWh
|
$1,318
-
kW-mo/yr
|
$892 | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,741 | $8,591 |
$7,022
93,240
kWh
|
$3,617
-
kW-mo/yr
|
$1,102 | - | |
04 | 2.7224: Reduce space conditioning during non-working hours | $14,731 | $150 |
$448
5,953
kWh
|
- | $46 |
$14,237
-
MMBtu
|
|
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,573 | $5,533 |
$2,947
39,133
kWh
|
$291
-
kW-mo/yr
|
$335 | - | |
TOTAL RECOMMENDED | $128,710 | $95,302 |
$88,666
1,177,355
kWh
|
$15,062
-
kW-mo/yr
|
$10,745 |
$14,237
-
MMBtu
|
||
TOTAL IMPLEMENTED | $125,137 | $89,769 |
$85,719
1,138,222
kWh
|
$14,771
-
kW-mo/yr
|
$10,410 |
$14,237
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs