Assessment Year | 2017 |
---|---|
Principal Product | Welded Aluminum Fishing Boats |
NAICS | 336612: Boat Building |
SIC | 3732: Boat Building and Repairing |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
64,000
ft2
|
Annual Production | 500
units
|
Production Hrs. Annual | 3,120
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $54,587 | 770,030 |
kWh
|
$0.071 |
Electricity Demand | $32,588 | 3,357 |
kW-mo/yr
|
$9.71 |
Natural Gas | $46,020 | 4,962 |
MMBtu
|
$9.27 |
TOTAL YEARLY COSTS | $133,196 | |||
RECOMMENDED SAVINGS* | $11,188 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,143 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2443: Re-use or recycle hot or cold process exhaust air | $5,881 | $50,450 | - | - |
$5,881
-
MMBtu
|
|
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,453 | $132 |
$1,573
22,152
kWh
|
$880
-
kW-mo/yr
|
- | |
03 | 2.4112: Install soft-start to eliminate nuisance trips | $601 | $1,100 |
$385
5,428
kWh
|
$216
-
kW-mo/yr
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $406 | $18 |
$142
1,994
kWh
|
$265
-
kW-mo/yr
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $345 | $412 |
$345
4,862
kWh
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $148 | $480 |
$95
1,335
kWh
|
$53
-
kW-mo/yr
|
- | |
07 | 2.7124: Make a practice of turning off lights when not needed | $48 | $15 |
$48
674
kWh
|
- | - | |
08 | 2.7135: Install occupancy sensors | $45 | $130 |
$45
629
kWh
|
- | - | |
09 | 2.7122: Disconnect ballasts | $21 | $15 |
$21
300
kWh
|
- | - | |
10 | 2.4322: Use or replace with energy efficient substitutes | $1,240 | $400 |
$1,240
17,474
kWh
|
- | - | |
TOTAL RECOMMENDED | $11,188 | $53,152 |
$3,893
54,848
kWh
|
$1,414
-
kW-mo/yr
|
$5,881
-
MMBtu
|
||
TOTAL IMPLEMENTED | $11,143 | $53,022 |
$3,848
54,219
kWh
|
$1,414
-
kW-mo/yr
|
$5,881
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs