Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

208

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Roasted coffee
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0346 #06 Y:2007 Use adjustable frequency drive or multiple speed motors on existing system $1,037 $1,863
SF0346 #05 Y:2007 Use adjustable frequency drive or multiple speed motors on existing system $8,090 $11,740
SF0346 #04 Y:2007 Install occupancy sensors $1,284 $1,620
SF0346 #03 Y:2007 Replace electrically-operated equipment with fossil fuel equipment $2,014 $1,859
SF0346 #02 Y:2007 Utilize controls to operate equipment only when needed $474 $262
SF0346 #01 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $1,744 $100
OR0493 #08 Y:2005 Recover waste heat from equipment $2,900 $17,000
OR0493 #07 Y:2005 Install occupancy sensors $2,400 $3,600
OR0493 #06 Y:2005 Reduce the pressure of compressed air to the minimum required $1,500 -
OR0493 #05 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $2,400 $2,500
OR0493 #04 Y:2005 Use optimum temperature $11,000 $13,000
OR0493 #03 Y:2005 Cross-train personnel to avoid lost time $5,400 $1,000
OR0493 #02 Y:2005 Utilize higher efficiency lamps and/or ballasts $5,900 $1,900
OR0493 #01 Y:2005 Modify process to reduce material use/cost $66,200 $1,000
UF0362 #11 Y:2005 Recycle fluorescent lamps $355 $3,496
UF0362 #10 Y:2005 Cool compressor air intake with heat exchanger $8,012 -
UF0362 #09 Y:2005 Insulate bare equipment $1,276 $168
UF0362 #08 Y:2005 Utilize higher efficiency lamps and/or ballasts $288 $245
UF0362 #07 Y:2005 Add area lighting switches $357 $3,655
UF0362 #06 Y:2005 Utilize higher efficiency lamps and/or ballasts $8,793 $16,078