ITAC Assessment: SF0346
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Coffee, Tea, Beer
NAICS 311920: Coffee and Tea Manufacturing
SIC 2095: Roasted Coffee
Sales Range $50
M
to 100
M
# of Employees 100
Plant Area 85,000
ft2
Annual Production 17,000,000
lb
Production Hrs. Annual 6,864
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $117,138 1,040,009
kWh
Electricity Demand $24,687 3,014
kW-mo/yr
Electricity Fees $12,298 -
Natural Gas $342,988 36,189
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $111,950 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,744

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,744 $100 $1,402
12,468
kWh
$342
-
kW-mo/yr
- -
02 2.6231: Utilize controls to operate equipment only when needed $474 $262 $474
4,217
kWh
- - -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,014 $1,859 $3,537
31,450
kWh
$1,159
-
kW-mo/yr
- $(-2,682.0)
-
MMBtu
04 2.7135: Install occupancy sensors $1,284 $1,620 $1,060
9,424
kWh
$224
-
kW-mo/yr
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,090 $11,740 $7,190
63,936
kWh
$900
-
kW-mo/yr
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,037 $1,863 $790
7,030
kWh
$247
-
kW-mo/yr
- -
07 2.2414: Use waste heat from hot flue gases to preheat $96,586 $193,493 - - $96,586
-
MMBtu
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $721 $1,875 $547
4,867
kWh
$174
-
kW-mo/yr
- -
TOTAL RECOMMENDED $111,950 $212,812 $15,000
133,392
kWh
$3,046
-
kW-mo/yr
$96,586
-
MMBtu
$(-2,682.0)
-
MMBtu
TOTAL IMPLEMENTED $1,744 $100 $1,402
12,468
kWh
$342
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs