Assessment Year | 2007 |
---|---|
Principal Product | Coffee, Tea, Beer |
NAICS | 311920: Coffee and Tea Manufacturing |
SIC | 2095: Roasted Coffee |
Sales Range | $50 M to 100M |
# of Employees | 100 |
Plant Area |
85,000
ft2
|
Annual Production | 17,000,000
lb
|
Production Hrs. Annual | 6,864
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $117,138 | 1,040,009 |
kWh
|
$0.11 |
Electricity Demand | $24,687 | 3,014 |
kW-mo/yr
|
$8.19 |
Electricity Fees | $12,298 | - |
|
- |
Natural Gas | $342,988 | 36,189 |
MMBtu
|
$9.48 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $111,950 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,744 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,744 | $100 |
$1,402
12,468
kWh
|
$342
-
kW-mo/yr
|
- | - | |
02 | 2.6231: Utilize controls to operate equipment only when needed | $474 | $262 |
$474
4,217
kWh
|
- | - | - | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $2,014 | $1,859 |
$3,537
31,450
kWh
|
$1,159
-
kW-mo/yr
|
- |
$(-2,682.0)
-
MMBtu
|
|
04 | 2.7135: Install occupancy sensors | $1,284 | $1,620 |
$1,060
9,424
kWh
|
$224
-
kW-mo/yr
|
- | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,090 | $11,740 |
$7,190
63,936
kWh
|
$900
-
kW-mo/yr
|
- | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,037 | $1,863 |
$790
7,030
kWh
|
$247
-
kW-mo/yr
|
- | - | |
07 | 2.2414: Use waste heat from hot flue gases to preheat | $96,586 | $193,493 | - | - |
$96,586
-
MMBtu
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $721 | $1,875 |
$547
4,867
kWh
|
$174
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $111,950 | $212,812 |
$15,000
133,392
kWh
|
$3,046
-
kW-mo/yr
|
$96,586
-
MMBtu
|
$(-2,682.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $1,744 | $100 |
$1,402
12,468
kWh
|
$342
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs