ITAC Assessment: AS0600
ITAC logo
ITAC Assessment: AS0600
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Heating and Bedding Pellets
NAICS 321999: All Other Miscellaneous Wood Product Manufacturing
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 16,000
ft2
Annual Production 40,000
ton
Production Hrs. Annual 8,688
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $617,001 8,567,492
kWh
Electricity Demand $281,754 16,798
kW-mo/yr
Electricity Fees $22,907 -
TOTAL YEARLY COSTS $921,662
RECOMMENDED SAVINGS* $326,128 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #1 Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
01 4.631: Install an uninteruptable power supply $274,416 $2,377,539 - - - $(-195,474.0)
-
MMBtu
- - $469,890
02 2.9114: Use solar heat to make electricty $37,872 $274,416 $38,292
531,837
kWh
$4,956
-
kW-mo/yr
- - $(-5,376.0) - -
03 4.322: Eliminate old stock and modify inventory control $8,750 $276 - - - - - $8,750 -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,289 $15,555 $1,732
24,057
kWh
$557
-
kW-mo/yr
- - - - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,357 $495 $1,027
14,260
kWh
$330
-
kW-mo/yr
- - - - -
06 4.821: Pay bills on time to avoid late fees $1,132 $39 - - $1,132 - - - -
07 2.6211: Conserve energy by efficient use of vending machines $312 $279 $237
3,286
kWh
$75
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $326,128 $2,668,599 $41,288
573,440
kWh
$5,918
-
kW-mo/yr
$1,132 $(-195,474.0)
-
MMBtu
$(-5,376.0) $8,750 $469,890
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #1 Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs