ITAC Assessment: GT0228
ITAC logo
ITAC Assessment: GT0228
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product SYNTHETIC YARN
NAICS
n/a
SIC 2282: Yarn Texturizing, Throwing, Twisting, and Winding Mills
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area
n/a
Annual Production 12,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $299,462 6,995,897
kWh
Natural Gas $69,851 17,200
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,143 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,551

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1243: Use heat from boiler blowdown to preheat boiler feed water $2,400 $5,000 - $2,400
-
MMBtu
-
02 2.2121: Increase amount of condensate returned $3,900 $6,000 - $3,900
-
MMBtu
-
03 2.4133: Use most efficient type of electric motors $1,500 $1,654 $1,500
35,170
kWh
- -
04 2.2614: Use cooling tower or economizer to replace chiller cooling $2,292 $2,600 $2,404
56,272
kWh
- $(-112.0)
05 2.4221: Install compressor air intakes in coolest locations $637 $500 $637
14,947
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,814 $2,100 $1,814
42,497
kWh
- -
07 2.6242: Minimize operation of equipment maintained in standby condition $3,600 $3,000 - $3,600
-
MMBtu
-
TOTAL RECOMMENDED $16,143 $20,854 $6,355
148,886
kWh
$9,900
-
MMBtu
$(-112.0)
TOTAL IMPLEMENTED $7,551 $7,254 $3,951
92,614
kWh
$3,600
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs