| Assessment Year | 1984 |
|---|---|
| Principal Product | SYNTHETIC YARN |
| NAICS |
n/a
|
| SIC | 2282: Yarn Texturizing, Throwing, Twisting, and Winding Mills |
| Sales Range | $10 M to 50M |
| # of Employees | 90 |
| Plant Area |
n/a
|
| Annual Production | 12,000,000
lb
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $299,462 | 6,995,897 |
kWh
|
$0.043 |
| Natural Gas | $69,851 | 17,200 |
MMBtu
|
$4.06 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $16,143 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,551 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $2,400 | $5,000 | - |
$2,400
-
MMBtu
|
- | |
| 02 | 2.2121: Increase amount of condensate returned | $3,900 | $6,000 | - |
$3,900
-
MMBtu
|
- | |
| 03 | 2.4133: Use most efficient type of electric motors | $1,500 | $1,654 |
$1,500
35,170
kWh
|
- | - | |
| 04 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $2,292 | $2,600 |
$2,404
56,272
kWh
|
- | $(-112.0) | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $637 | $500 |
$637
14,947
kWh
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,814 | $2,100 |
$1,814
42,497
kWh
|
- | - | |
| 07 | 2.6242: Minimize operation of equipment maintained in standby condition | $3,600 | $3,000 | - |
$3,600
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $16,143 | $20,854 |
$6,355
148,886
kWh
|
$9,900
-
MMBtu
|
$(-112.0) | ||
| TOTAL IMPLEMENTED | $7,551 | $7,254 |
$3,951
92,614
kWh
|
$3,600
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs