ITAC Assessment: AT0051
ITAC logo
ITAC Assessment: AT0051
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product RULED PAPER & NOTEBOOKS
NAICS
n/a
SIC 2678: Stationery, Tablets, and Related Products
Sales Range $10
M
to 50
M
# of Employees 210
Plant Area
n/a
Annual Production 72,000
ton
Production Hrs. Annual 4,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,904 533,998
kWh
Natural Gas $5,876 902
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,544 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,544

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4221: Install compressor air intakes in coolest locations $263 $400 $263
4,396
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $50 $55 $50
879
kWh
03 2.7226: Use computer programs to optimize hvac performance $6,951 $2,100 $6,951
116,354
kWh
04 2.4231: Reduce the pressure of compressed air to the minimum required $280 - $280
4,689
kWh
TOTAL RECOMMENDED $7,544 $2,555 $7,544
126,318
kWh
TOTAL IMPLEMENTED $7,544 $2,555 $7,544
126,318
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs