ITAC Assessment: SF0352
ITAC logo
ITAC Assessment: SF0352
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Coffee and teas
NAICS 311920: Coffee and Tea Manufacturing
SIC 2095: Roasted Coffee
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 50,000
ft2
Annual Production 8,000,000
lb
Production Hrs. Annual 3,120
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $75,676 546,733
kWh
Electricity Demand $13,220 1,687
kW-mo/yr
Electricity Fees $7,328 -
Natural Gas $62,138 5,312
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,699 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7134: Use photocell controls $651 $664 $455
3,286
kWh
$196
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,436 $3,094 $2,075
14,984
kWh
$361
-
kW-mo/yr
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,354 $1,767 $1,354
9,773
kWh
-
04 2.7135: Install occupancy sensors $405 $738 $319
2,303
kWh
$86
-
kW-mo/yr
05 2.4322: Use or replace with energy efficient substitutes $5,195 $21,950 $5,195
37,506
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,658 $9,606 $1,321
9,538
kWh
$337
-
kW-mo/yr
TOTAL RECOMMENDED $11,699 $37,819 $10,719
77,390
kWh
$980
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs