ITAC Assessment: KG0022
ITAC logo
ITAC Assessment: KG0022
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Children's sleepwear
NAICS
n/a
SIC 2341: Women's, Misses', Children's, and Infants' Underwear and Nightwear
Sales Range $10
M
to 50
M
# of Employees 520
Plant Area 86,500
ft2
Annual Production 623,000
pieces
Production Hrs. Annual 2,468
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $221,045 2,563,306
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $105,295 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.2692: Use outside cold water source as a supply of cooling water $84,629 $240,000 $84,629
1,183,470
kWh
02 2.7241: Install outside air damper / economizer on hvac unit $14,244 $2,280 $14,244
432,884
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,352 $1,521 $3,352
33,118
kWh
04 2.7261: Install timers and/or thermostats $1,757 $450 $1,757
53,341
kWh
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,190 $20 $1,190
11,723
kWh
06 2.6218: Turn off equipment when not in use $123 $180 $123
3,810
kWh
TOTAL RECOMMENDED $105,295 $244,451 $105,295
1,718,346
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs