ITAC Assessment: HO0077
ITAC logo
ITAC Assessment: HO0077
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Reagents for Medical Applications
NAICS
n/a
SIC 2835: In Vitro and In Vivo Diagnostic Substances
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 250,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,350
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $577,378 6,458,382
kWh
Natural Gas $10,433 1,861
MMBtu
Fuel Oil #2 $103,580 25,796
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $309,403 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,225

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,135 $18,875 $8,135
91,442
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,374 $9,484 $2,374
26,671
kWh
- -
03 2.4133: Use most efficient type of electric motors $716 $2,035 $716
7,913
kWh
- -
04 2.7229: Air condition only space necessary $76,210 - $76,210
852,579
kWh
- -
05 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $221,968 $1,440,000 $438,169
4,901,524
kWh
$(-108,331.0)
-
MMBtu
$(-107,870.0)
TOTAL RECOMMENDED $309,403 $1,470,394 $525,604
5,880,129
kWh
$(-108,331.0)
-
MMBtu
$(-107,870.0)
TOTAL IMPLEMENTED $11,225 $30,394 $11,225
126,026
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs