ITAC Assessment: TA0117
ITAC logo
ITAC Assessment: TA0117
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Industrial and commercial fan and blower
NAICS 333413: Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 98,540
ft2
Annual Production 1,235,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $355,476 5,976,408
kWh
Electricity Demand $101,244 15,019
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $73,277 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,987

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $21,020 $7,980 $18,949
187,800
kWh
$2,071
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,208 $5,065 $1,794
17,781
kWh
$414
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,925 $9 $1,925
19,070
kWh
-
04 2.3132: Recharge batteries on during off-peak demand periods $478 - - $478
-
kW-mo/yr
05 2.6218: Turn off equipment when not in use $2,356 - $2,356
31,045
kWh
-
06 2.7447: Install vinyl strip / high speed / air curtain doors $45,290 $22,980 $45,290
448,852
kWh
-
TOTAL RECOMMENDED $73,277 $36,034 $70,314
704,548
kWh
$2,963
-
kW-mo/yr
TOTAL IMPLEMENTED $27,987 $13,054 $25,024
255,696
kWh
$2,963
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs