Assessment Year | 2005 |
---|---|
Principal Product | Coffee Beans |
NAICS | 311911: Roasted Nuts and Peanut Butter Manufacturing |
SIC | 2095: Roasted Coffee |
Sales Range | $10 M to 50M |
# of Employees | 92 |
Plant Area |
125,000
ft2
|
Annual Production | 6,500,000
lb
|
Production Hrs. Annual | 3,625
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $51,289 | 832,480 |
kWh
|
$0.062 |
Electricity Demand | $7,643 | 1,644 |
kW-mo/yr
|
$4.65 |
Electricity Fees | $240 | - |
|
- |
Natural Gas | $168,665 | 21,736 |
MMBtu
|
$7.76 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $97,700 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 4.131: Modify process to reduce material use/cost | $66,200 | $1,000 | - | - | - | - | - | $66,200 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,900 | $1,900 |
$3,000
49,300
kWh
|
$650
-
kW-mo/yr
|
- | - | $2,250 | - | |
03 | 4.432: Cross-train personnel to avoid lost time | $5,400 | $1,000 | - | - | - | $5,400 | - | - | |
04 | 2.2211: Use optimum temperature | $11,000 | $13,000 | - | - |
$11,000
-
MMBtu
|
- | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,400 | $2,500 |
$2,115
34,600
kWh
|
$285
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,500 | - |
$1,300
21,000
kWh
|
$200
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.7135: Install occupancy sensors | $2,400 | $3,600 |
$1,400
22,950
kWh
|
- | - | - | $1,000 | - | |
08 | 2.2437: Recover waste heat from equipment | $2,900 | $17,000 | - | - |
$2,900
-
MMBtu
|
- | - | - | |
TOTAL RECOMMENDED | $97,700 | $40,000 |
$7,815
127,850
kWh
|
$1,135
-
kW-mo/yr
|
$13,900
-
MMBtu
|
$5,400 | $3,250 | $66,200 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs