ITAC Assessment: OR0493
ITAC logo
ITAC Assessment: OR0493
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Coffee Beans
NAICS 311911: Roasted Nuts and Peanut Butter Manufacturing
SIC 2095: Roasted Coffee
Sales Range $10
M
to 50
M
# of Employees 92
Plant Area 125,000
ft2
Annual Production 6,500,000
lb
Production Hrs. Annual 3,625
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,289 832,480
kWh
Electricity Demand $7,643 1,644
kW-mo/yr
Electricity Fees $240 -
Natural Gas $168,665 21,736
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $97,700 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
01 4.131: Modify process to reduce material use/cost $66,200 $1,000 - - - - - $66,200
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,900 $1,900 $3,000
49,300
kWh
$650
-
kW-mo/yr
- - $2,250 -
03 4.432: Cross-train personnel to avoid lost time $5,400 $1,000 - - - $5,400 - -
04 2.2211: Use optimum temperature $11,000 $13,000 - - $11,000
-
MMBtu
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,400 $2,500 $2,115
34,600
kWh
$285
-
kW-mo/yr
- - - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,500 - $1,300
21,000
kWh
$200
-
kW-mo/yr
- - - -
07 2.7135: Install occupancy sensors $2,400 $3,600 $1,400
22,950
kWh
- - - $1,000 -
08 2.2437: Recover waste heat from equipment $2,900 $17,000 - - $2,900
-
MMBtu
- - -
TOTAL RECOMMENDED $97,700 $40,000 $7,815
127,850
kWh
$1,135
-
kW-mo/yr
$13,900
-
MMBtu
$5,400 $3,250 $66,200
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs