ITAC Assessment: LS2309
ITAC logo
ITAC Assessment: LS2309
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Naval Hovercrafts
NAICS 336611: Ship Building and Repairing
SIC 3731: Ship Building and Repairing
Sales Range less than $500
k
# of Employees 500
Plant Area 974,294
ft2
Annual Production 1
units
Production Hrs. Annual 6,552
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $621,014 7,541,001
kWh
Electricity Demand $174,613 16,258
kW-mo/yr
TOTAL YEARLY COSTS $795,627
RECOMMENDED SAVINGS* $62,039 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,013

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.6218: Turn off equipment when not in use $8,886 - $8,886
108,362
kWh
02 2.7224: Reduce space conditioning during non-working hours $8,938 $225 $8,938
109,000
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,547 $180 $3,547
43,256
kWh
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,393 $125 $1,393
16,983
kWh
05 2.7135: Install occupancy sensors $642 $521 $642
7,831
kWh
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,628 $1,550 $1,628
19,848
kWh
07 2.9114: Use solar heat to make electricty $37,005 $231,000 $37,005
451,279
kWh
TOTAL RECOMMENDED $62,039 $233,601 $62,039
756,559
kWh
TOTAL IMPLEMENTED $22,013 $926 $22,013
268,449
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs