Assessment Year | 2002 |
---|---|
Principal Product | Structural Steel, Pressure Vessels, and Plating |
NAICS |
n/a
|
SIC | 3441: Fabricated Structural Metal |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
650,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $21,672 | 812,760 |
kWh
|
$0.027 |
Electricity Demand | $34,283 | 337 |
kW-mo/yr
|
$101.73 |
Electricity Fees | $7,848 | - |
|
- |
Natural Gas | $175,321 | 30,540 |
MMBtu
|
$5.74 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $208,339 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $42,770 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $986 | - | - |
$986
-
kW-mo/yr
|
- | - | |
02 | 2.3212: Optimize plant power factor | $5,590 | $9,800 | - |
$5,590
-
kW-mo/yr
|
- | - | |
03 | 2.7243: Improve air circulation with destratification fans / other methods | $30,500 | $7,600 | - | - |
$30,500
-
MMBtu
|
- | |
04 | 2.2437: Recover waste heat from equipment | $1,450 | $700 | - | - |
$1,450
-
MMBtu
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $844 | $406 |
$497
16,501
kWh
|
$347
-
kW-mo/yr
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,400 | $2,000 |
$2,000
64,900
kWh
|
$1,400
-
kW-mo/yr
|
- | - | |
07 | 2.7145: Install skylights | $17,689 | $2,800 |
$14,633
485,580
kWh
|
$3,056
-
kW-mo/yr
|
- | - | |
08 | 4.132: Purchase new equipment to reduce material use / cost | $147,880 | $100,000 | - | - | - | $147,880 | |
TOTAL RECOMMENDED | $208,339 | $123,306 |
$17,130
566,981
kWh
|
$11,379
-
kW-mo/yr
|
$31,950
-
MMBtu
|
$147,880 | ||
TOTAL IMPLEMENTED | $42,770 | $20,506 |
$2,497
81,401
kWh
|
$8,323
-
kW-mo/yr
|
$31,950
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs