208
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Roasted coffee | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| LS1903 #04 Y:2018 | 04 | 2018 | Install / repair insulation on steam lines | $480 | $240 | |
| LS1903 #03 Y:2018 | 03 | 2018 | Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings | $839 | - | |
| LS1903 #02 Y:2018 | 02 | 2018 | Reduce the pressure of compressed air to the minimum required | $135 | - | |
| LS1903 #01 Y:2018 | 01 | 2018 | Utilize controls to operate equipment only when needed | $1,079 | $150 | |
| LS0012 #06 Y:2017 | 06 | 2017 | Clean or color roof to reduce solar load | $28,215 | $80,000 | |
| LS0012 #05 Y:2017 | 05 | 2017 | Reduce excessive boiler blowdown | $3,685 | $4,250 | |
| LS0012 #04 Y:2017 | 04 | 2017 | Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings | $21,748 | $15,200 | |
| LS0012 #03 Y:2017 | 03 | 2017 | Insulate bare equipment | $993 | $548 | |
| LS0012 #02 Y:2017 | 02 | 2017 | Utilize energy-efficient belts and other improved mechanisms | $2,205 | $920 | |
| LS0012 #01 Y:2017 | 01 | 2017 | Use heat from boiler blowdown to preheat boiler feed water | $28,766 | $12,000 | |
| DL0168 #09 Y:2016 | 09 | 2016 | Use adjustable frequency drive or multiple speed motors on existing system | $27,900 | $190,600 | |
| DL0168 #08 Y:2016 | 08 | 2016 | Utilize higher efficiency lamps and/or ballasts | $22,000 | $67,370 | |
| DL0168 #07 Y:2016 | 07 | 2016 | Reduce space conditioning during non-working hours | $2,320 | $4,980 | |
| DL0168 #06 Y:2016 | 06 | 2016 | Utilize controls to operate equipment only when needed | $4,385 | $7,400 | |
| DL0168 #05 Y:2016 | 05 | 2016 | Eliminate leaks in water lines and valves | $4,520 | $6,800 | |
| DL0168 #04 Y:2016 | 04 | 2016 | Utilize controls to operate equipment only when needed | $67,220 | $62,600 | |
| DL0168 #03 Y:2016 | 03 | 2016 | Utilize higher efficiency lamps and/or ballasts | $5,120 | $1,000 | |
| DL0168 #02 Y:2016 | 02 | 2016 | Turn off equipment when not in use | $2,380 | $200 | |
| DL0168 #01 Y:2016 | 01 | 2016 | Reduce space conditioning during non-working hours | $3,910 | $200 | |
| DL0090 #08 Y:2012 | 08 | 2012 | Adjust burners for efficient operation | $2,160 | $2,160 |