Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Coffee Packets
NAICS 311920: Coffee and Tea Manufacturing
SIC 2095: Roasted Coffee
Sales Range $500
k
to 1
M
# of Employees 200
Plant Area 200,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 7,752
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $696,487 8,497,913
kWh
Natural Gas $11,594 1,527
MMBtu
Waste Disposal Costs
Water Usage $10,609 666
Tgal
Water Disposal $4,916 598
Tgal
TOTAL YEARLY COSTS $723,606
RECOMMENDED SAVINGS* $139,755 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Usage Savings Water Disposal Savings
01 2.7224: Reduce space conditioning during non-working hours $3,910 $200 $1,160
14,130
kWh
$2,750
-
MMBtu
- -
02 2.6218: Turn off equipment when not in use $2,380 $200 $2,380
29,060
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,120 $1,000 $5,120
62,410
kWh
- - -
04 2.6231: Utilize controls to operate equipment only when needed $67,220 $62,600 $67,220
819,800
kWh
- - -
05 3.4154: Eliminate leaks in water lines and valves $4,520 $6,800 - - $2,980
-
Tgal
$1,540
-
Tgal
06 2.6231: Utilize controls to operate equipment only when needed $4,385 $7,400 $1,055
12,860
kWh
$3,330
-
MMBtu
- -
07 2.7224: Reduce space conditioning during non-working hours $2,320 $4,980 $360
4,380
kWh
$1,960
-
MMBtu
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $22,000 $67,370 $22,000
268,300
kWh
- - -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $27,900 $190,600 $27,900
340,270
kWh
- - -
TOTAL RECOMMENDED $139,755 $341,150 $127,195
1,551,210
kWh
$8,040
-
MMBtu
$2,980
-
Tgal
$1,540
-
Tgal
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Usage Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs