277
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | Flavoring extracts and flavoring syrups, not elsewhere classified | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
UC2414 #07 Y:2024 | 07 | 2024 | Replace existing equipment with more suitable substitutes | $1,063 | $4,891 |
n/a
|
UC2414 #06 Y:2024 | 06 | 2024 | Recover waste heat from equipment | $2,784 | $5,236 |
n/a
|
UC2414 #05 Y:2024 | 05 | 2024 | Install compressor air intakes in coolest locations | $225 | $1,283 |
n/a
|
UC2414 #04 Y:2024 | 04 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $539 | $1,300 |
n/a
|
UC2414 #03 Y:2024 | 03 | 2024 | Reduce the pressure of compressed air to the minimum required | $580 | $75 |
n/a
|
UC2414 #02 Y:2024 | 02 | 2024 | Install occupancy sensors | $815 | $693 |
n/a
|
UC2414 #01 Y:2024 | 01 | 2024 | Apply for tax-free status for energy purchases | $1,657 | - |
n/a
|
UF0534 #05 Y:2019 | 05 | 2019 | Improve air circulation with destratification fans / other methods | $13,000 | $18,400 | |
UF0534 #04 Y:2019 | 04 | 2019 | Utilize higher efficiency lamps and/or ballasts | $1,018 | - | |
UF0534 #03 Y:2019 | 03 | 2019 | Install desiccant humidity control system | $8,399 | $570 | |
UF0534 #02 Y:2019 | 02 | 2019 | Insulate glazing, walls, ceilings, and roofs | $8,685 | $27,820 | |
UF0534 #01 Y:2019 | 01 | 2019 | Use solar heat to make electricty | $53,586 | $333,760 | |
UF0514 #07 Y:2017 | 07 | 2017 | Analyze flue gas for proper air/fuel ratio | $2,432 | - | |
UF0514 #06 Y:2017 | 06 | 2017 | Use most efficient type of electric motors | $3,693 | $6,775 | |
UF0514 #05 Y:2017 | 05 | 2017 | Install / repair insulation on steam lines | $3,740 | $2,882 | |
UF0514 #04 Y:2017 | 04 | 2017 | Reduce excess steam bleeding | $4,320 | - | |
UF0514 #03 Y:2017 | 03 | 2017 | Use computer programs to optimize hvac performance | $5,710 | $7,580 | |
UF0514 #02 Y:2017 | 02 | 2017 | Clean or color roof to reduce solar load | $7,847 | $20,000 | |
UF0514 #01 Y:2017 | 01 | 2017 | Utilize higher efficiency lamps and/or ballasts | $40,154 | $30,844 | |
UD0952 #13 Y:2016 | 13 | 2016 | Use filter and drying oven to reduce sludge volume | $17,619 | $90,000 |