ITAC Assessment: UF0534
ITAC logo
ITAC Assessment: UF0534
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Food packaging
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2087: Flavoring Extracts and Flavoring Syrups, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 100
Plant Area 95,000
ft2
Annual Production 40,000
pieces
Production Hrs. Annual 4,680
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $194,564 2,067,680
kWh
Electricity Demand $40,036 4,214
kW-mo/yr
Electricity Fees $47,658 -
Natural Gas $1,182 80
MMBtu
TOTAL YEARLY COSTS $283,440
RECOMMENDED SAVINGS* $84,688 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Product Savings
01 2.9114: Use solar heat to make electricty $53,586 $333,760 $53,586
570,064
kWh
- -
02 2.7491: Insulate glazing, walls, ceilings, and roofs $8,685 $27,820 $8,685
92,390
kWh
- -
03 2.7273: Install desiccant humidity control system $8,399 $570 $8,399
89,352
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,018 - $725
7,710
kWh
$293
-
kW-mo/yr
-
05 2.7243: Improve air circulation with destratification fans / other methods $13,000 $18,400 - - $13,000
TOTAL RECOMMENDED $84,688 $380,550 $71,395
759,516
kWh
$293
-
kW-mo/yr
$13,000
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs