ITAC Assessment: UF0514
ITAC logo
ITAC Assessment: UF0514
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Citrus and fruit flavors
NAICS 311930: Flavoring Syrup and Concentrate Manufacturing
SIC 2087: Flavoring Extracts and Flavoring Syrups, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 62
Plant Area 313,632
ft2
Annual Production 11,000,000
lb
Production Hrs. Annual 6,864
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $285,596 4,325,800
kWh
Electricity Demand $83,971 9,115
kW-mo/yr
Natural Gas $71,772 29,133
MMBtu
Waste Disposal Costs
Water Disposal $495,993 3,233,000
Tgal
TOTAL YEARLY COSTS $937,332
RECOMMENDED SAVINGS* $67,896 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $62,186

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $40,154 $30,844 $31,994
484,751
kWh
$8,160
-
kW-mo/yr
-
02 2.7425: Clean or color roof to reduce solar load $7,847 $20,000 $7,847
118,887
kWh
- -
03 2.7226: Use computer programs to optimize hvac performance $5,710 $7,580 $5,710
86,516
kWh
- -
04 2.2162: Reduce excess steam bleeding $4,320 - - - $4,320
-
MMBtu
05 2.2136: Install / repair insulation on steam lines $3,740 $2,882 - - $3,740
-
MMBtu
06 2.4133: Use most efficient type of electric motors $3,693 $6,775 $2,788
42,249
kWh
$905
-
kW-mo/yr
-
07 2.1233: Analyze flue gas for proper air/fuel ratio $2,432 - - - $2,432
-
MMBtu
TOTAL RECOMMENDED $67,896 $68,081 $48,339
732,403
kWh
$9,065
-
kW-mo/yr
$10,492
-
MMBtu
TOTAL IMPLEMENTED $62,186 $60,501 $42,629
645,887
kWh
$9,065
-
kW-mo/yr
$10,492
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs