ITAC Assessment: RU0042
ITAC logo
ITAC Assessment: RU0042
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product MONEL & INCONEL WIRE
NAICS
n/a
SIC 3315: Steel Wiredrawing and Steel Nails and Spikes
Sales Range $10
M
to 50
M
# of Employees 240
Plant Area
n/a
Annual Production 14,000,000
lb
Production Hrs. Annual 6,600
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $710,243 15,609,027
kWh
Natural Gas $47,666 10,500
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $105,810 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $74,066

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4312: Improve lubrication practices $11,892 $800 $11,892
261,430
kWh
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $16,798 $21,400 $16,798
369,285
kWh
03 2.4221: Install compressor air intakes in coolest locations $707 $302 $707
15,533
kWh
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,960 - $1,960
43,083
kWh
05 2.2514: Cover open tanks $2,347 $400 $2,347
51,583
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $7,295 $1,510 $7,295
160,317
kWh
07 2.4133: Use most efficient type of electric motors $35,736 $44,360 $35,736
785,463
kWh
08 2.6218: Turn off equipment when not in use $29,075 $94,000 $29,075
638,921
kWh
TOTAL RECOMMENDED $105,810 $162,772 $105,810
2,325,615
kWh
TOTAL IMPLEMENTED $74,066 $139,870 $74,066
1,627,784
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings