| Assessment Year | 2003 |
|---|---|
| Principal Product | Track Link and Track Shoe Assemblies |
| NAICS | 333120: Construction Machinery Manufacturing |
| SIC | 3531: Construction Machinery and Equipment |
| Sales Range | $5 M to 10M |
| # of Employees | 86 |
| Plant Area |
182,500
ft2
|
| Annual Production | 30,000
pieces
|
| Production Hrs. Annual | 5,200
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $180,492 | 3,003,840 |
kWh
|
$0.060 |
| Natural Gas | $34,652 | 7,618 |
MMBtu
|
$4.55 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $57,402 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $4,182 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $22,362 | $38,415 | n/a |
$20,478
340,740
kWh
|
- | $914 | $970 |
| 02 | 2.4133: Use most efficient type of electric motors | $8,705 | $14,480 |
$8,705
144,840
kWh
|
- | - | - | |
| 03 | 2.7111: Reduce illumination to minimum necessary levels | $7,910 | $555 |
$7,660
127,466
kWh
|
- | $139 | $111 | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,266 | $9,660 |
$7,186
119,578
kWh
|
- | $(-25.0) | $105 | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,676 | $3,857 |
$3,676
61,179
kWh
|
- | - | - | |
| 06 | 2.7135: Install occupancy sensors | $1,328 | $1,275 |
$1,328
22,108
kWh
|
- | - | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $736 | $1,500 |
$386
6,423
kWh
|
- | $225 | $125 | |
| 08 | 2.7134: Use photocell controls | $506 | $500 |
$425
7,076
kWh
|
- | $32 | $49 | |
| 09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $299 | - |
$299
4,975
kWh
|
- | - | - | |
| 10 | 3.5316: Contract a wood pallet recycling company | $2,032 | $72 | - |
$2,032
-
lb
|
- | - | |
| 11 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $1,958 | $5,500 | - |
$1,958
-
lb
|
- | - | |
| 12 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $624 | $600 | - |
$624
-
lb
|
- | - | |
| TOTAL RECOMMENDED | $57,402 | $76,414 |
$50,143
834,385
kWh
|
$4,614
-
lb
|
$1,285 | $1,360 | ||
| TOTAL IMPLEMENTED | $4,182 | $4,357 |
$4,101
68,255
kWh
|
- | $32 | $49 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs