ITAC Assessment: NC0326
ITAC logo
ITAC Assessment: NC0326
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Hammocks
NAICS 337124: Metal Household Furniture Manufacturing
SIC 2590:
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 300,000
ft2
Annual Production 350,000
pieces
Production Hrs. Annual 3,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $104,922 1,498,798
kWh
Electricity Demand $22,476 5,953
kW-mo/yr
Electricity Fees $3,796 -
Natural Gas $133,585 9,815
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,569 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,791

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $18,944 $2,000 $79,766
-
kWh
$(-61,322.0)
-
kW-mo/yr
$500 - - -
02 2.6218: Turn off equipment when not in use $6,606 $5,000 $6,606
92,000
kWh
- - - - -
03 2.2425: Use flue gases to heat process or service water $6,834 $10,100 $(-179.0)
(-2,487)
kWh
$(-40.0)
-
kW-mo/yr
- $7,053
-
MMBtu
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,368 - $1,116
15,540
kWh
$252
-
kW-mo/yr
- - - -
05 2.7261: Install timers and/or thermostats $3,139 $900 $3,139
43,712
kWh
- - - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $766 $503 $632
8,802
kWh
$134
-
kW-mo/yr
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,112 $50 $767
10,688
kWh
$157
-
kW-mo/yr
- - - $188
08 4.424: Improve space comfort conditioning $800 $350 - - - - $800 -
TOTAL RECOMMENDED $39,569 $18,903 $91,847
168,255
kWh
$(-60,819.0)
-
kW-mo/yr
$500 $7,053
-
MMBtu
$800 $188
TOTAL IMPLEMENTED $13,791 $6,803 $12,260
170,742
kWh
$543
-
kW-mo/yr
- - $800 $188
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs