20
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Bottled and canned soft drinks and carbonated waters | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UU0229 #04 Y:2023 | 04 | 2023 | Use optimum temperature | $2,146 | $3,060 | |
| UU0229 #03 Y:2023 | 03 | 2023 | Install heat pipes / raise cooling setpoint | $4,945 | $3,480 | |
| UU0229 #02 Y:2023 | 02 | 2023 | Install compressor air intakes in coolest locations | $11,440 | $3,816 | |
| UU0229 #01 Y:2023 | 01 | 2023 | Apply for tax-free status for energy purchases | $14,527 | $5,600 | |
| UU0098 #05 Y:2005 | 05 | 2005 | Optimize plant power factor | $2,380 | $2,040 | |
| UU0098 #04 Y:2005 | 04 | 2005 | Use most efficient type of electric motors | $410 | $2,880 | |
| UU0098 #03 Y:2005 | 03 | 2005 | Utilize higher efficiency lamps and/or ballasts | $3,690 | $1,000 | |
| UU0098 #02 Y:2005 | 02 | 2005 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,360 | $2,100 | |
| UU0098 #01 Y:2005 | 01 | 2005 | Use demand controller or load shedder | $2,060 | - | |
| UU0044 #06 Y:2003 | 06 | 2003 | Utilize higher efficiency lamps and/or ballasts | $2,211 | $7,976 | |
| UU0044 #05 Y:2003 | 05 | 2003 | Recharge batteries on during off-peak demand periods | $1,070 | - | |
| UU0044 #04 Y:2003 | 04 | 2003 | Eliminate or reduce compressed air usage | $1,476 | $800 | |
| UU0044 #03 Y:2003 | 03 | 2003 | Eliminate or reduce compressed air usage | $1,390 | $5,000 | |
| UU0044 #02 Y:2003 | 02 | 2003 | Reschedule plant operations or reduce load to avoid peaks | $2,130 | - | |
| UU0044 #01 Y:2003 | 01 | 2003 | Use most efficient type of electric motors | $1,210 | $3,508 | |
| UU0034 #05 Y:2002 | 05 | 2002 | Install compressor air intakes in coolest locations | $1,759 | $800 | |
| UU0034 #04 Y:2002 | 04 | 2002 | Reschedule plant operations or reduce load to avoid peaks | $10,560 | - | |
| UU0034 #03 Y:2002 | 03 | 2002 | Analyze flue gas for proper air/fuel ratio | $1,938 | $1,000 | |
| UU0034 #02 Y:2002 | 02 | 2002 | Install / repair insulation on steam lines | $2,627 | $3,621 | |
| UU0034 #01 Y:2002 | 01 | 2002 | Optimize plant power factor | $3,790 | $2,000 |