ITAC Assessment: UU0034
ITAC logo
ITAC Assessment: UU0034
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product beverages
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 400,000
ft2
Annual Production 23,000,000
pieces
Production Hrs. Annual 8,568
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $93,363 3,365,900
kWh
Electricity Demand $61,058 7,344
kW-mo/yr
Electricity Fees $14,044 -
Natural Gas $76,307 19,502
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,674 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $3,790 $2,000 - $3,790
-
kW-mo/yr
-
02 2.2136: Install / repair insulation on steam lines $2,627 $3,621 - - $2,627
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $1,938 $1,000 - - $1,938
-
MMBtu
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $10,560 - - $10,560
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $1,759 $800 $1,268
39,617
kWh
$491
-
kW-mo/yr
-
TOTAL RECOMMENDED $20,674 $7,421 $1,268
39,617
kWh
$14,841
-
kW-mo/yr
$4,565
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs