ITAC Assessment: UU0229
ITAC logo
ITAC Assessment: UU0229
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Canned Beverages
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 650,000
ft2
Annual Production 25,000,000
units
Production Hrs. Annual 8,400
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $292,022 5,358,199
kWh
Electricity Demand $311,688 17,760
kW-mo/yr
Electricity Fees $64,738 -
TOTAL YEARLY COSTS $668,448
RECOMMENDED SAVINGS* $33,058 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,618

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.8121: Apply for tax-free status for energy purchases $14,527 $5,600 - - $14,527
02 2.4221: Install compressor air intakes in coolest locations $11,440 $3,816 $8,895
163,213
kWh
$2,545
-
kW-mo/yr
-
03 2.7272: Install heat pipes / raise cooling setpoint $4,945 $3,480 $4,883
89,596
kWh
$62
-
kW-mo/yr
-
04 2.2211: Use optimum temperature $2,146 $3,060 $1,472
27,013
kWh
$674
-
kW-mo/yr
-
TOTAL RECOMMENDED $33,058 $15,956 $15,250
279,822
kWh
$3,281
-
kW-mo/yr
$14,527
TOTAL IMPLEMENTED $21,618 $12,140 $6,355
116,609
kWh
$736
-
kW-mo/yr
$14,527
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs