Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

174

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Frozen bakery products, except bread
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IP0133 #05 Y:2019 Re-size charging openings or add movable cover or door $2,196 $4,991
IP0133 #04 Y:2019 Turn off equipment during breaks, reduce operating time $618 $553
IP0133 #03 Y:2019 Utilize higher efficiency lamps and/or ballasts $16,033 $14,189
IP0133 #02 Y:2019 Utilize outside air instead of conditioned air for drying $2,073 $1,218
IP0133 #01 Y:2019 Install occupancy sensors $1,574 $343
OK0988 #04 Y:2018 Use solar heat to heat water $4,920 $155,149
OK0988 #03 Y:2018 Utilize higher efficiency lamps and/or ballasts $8,279 $15,642
OK0988 #02 Y:2018 Utilize higher efficiency lamps and/or ballasts $739 $2,330
OK0988 #01 Y:2018 Optimize plant power factor $7,394 $12,000
SU0461 #07 Y:2018 Conserve energy by efficient use of vending machines $315 $955
SU0461 #06 Y:2018 Utilize higher efficiency lamps and/or ballasts $11,640 $27,679
SU0461 #05 Y:2018 Replace boiler $10,937 $22,000
SU0461 #04 Y:2018 Utilize higher efficiency lamps and/or ballasts $272 $397
SU0461 #03 Y:2018 Install compressor air intakes in coolest locations $910 $651
SU0461 #02 Y:2018 Reschedule plant operations or reduce load to avoid peaks $3,138 $700
SU0461 #01 Y:2018 Reduce the pressure of compressed air to the minimum required $2,315 -
BS0068 #05 Y:2015 Increase amount of waste recovered for resale $12,480 $11,240
BS0068 #04 Y:2015 Use optimum thickness insulation $29 $100
BS0068 #03 Y:2015 Air condition only space necessary $1,060 $4,455
BS0068 #02 Y:2015 Use flue gases to heat process or service water $1,272 $5,853