ITAC Assessment: IP0133
ITAC logo
ITAC Assessment: IP0133
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Pie
NAICS 311813: Frozen Cakes, Pies, and Other Pastries Manufacturing
SIC 2053: Frozen Bakery Products, Except Bread
Sales Range $100
M
to 500
M
# of Employees 350
Plant Area 211,000
ft2
Annual Production 8,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $471,129 13,823,000
kWh
Electricity Demand $662,114 30,911
kW-mo/yr
Electricity Fees $(-30,635.0) -
Natural Gas $45,059 56,352
MMBtu
TOTAL YEARLY COSTS $1,147,667
RECOMMENDED SAVINGS* $22,494 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7135: Install occupancy sensors $1,574 $343 $1,574
46,176
kWh
-
02 2.2711: Utilize outside air instead of conditioned air for drying $2,073 $1,218 $1,114
32,675
kWh
$959
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $16,033 $14,189 $8,622
252,982
kWh
$7,411
-
kW-mo/yr
04 2.6212: Turn off equipment during breaks, reduce operating time $618 $553 $618
18,125
kWh
-
05 2.2531: Re-size charging openings or add movable cover or door $2,196 $4,991 $2,196
64,447
kWh
-
TOTAL RECOMMENDED $22,494 $21,294 $14,124
414,405
kWh
$8,370
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs