ITAC Assessment: BS0068
ITAC logo
ITAC Assessment: BS0068
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Pies
NAICS 311813: Frozen Cakes, Pies, and Other Pastries Manufacturing
SIC 2053: Frozen Bakery Products, Except Bread
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 39,000
ft2
Annual Production 5,000,000
units
Production Hrs. Annual 2,080
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $129,009 1,569,085
kWh
Electricity Demand $20,377 4,047
kW-mo/yr
Natural Gas $58,940 7,182
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,911 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Primary Raw Material Savings
01 2.2515: Use optimum thickness insulation $70 $51 - $70
-
MMBtu
-
02 2.2425: Use flue gases to heat process or service water $1,272 $5,853 - $1,272
-
MMBtu
-
03 2.7229: Air condition only space necessary $1,060 $4,455 $1,060
12,956
kWh
- -
04 2.2515: Use optimum thickness insulation $29 $100 $29
356
kWh
- -
05 3.5313: Increase amount of waste recovered for resale $12,480 $11,240 - - $12,480
TOTAL RECOMMENDED $14,911 $21,699 $1,089
13,312
kWh
$1,342
-
MMBtu
$12,480
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs