2,417
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
UC2417 #06 Y:2024 | 06 | 2024 | Lower temperature during the winter season and vice-versa | $1,329 | - |
n/a
|
UC2417 #05 Y:2024 | 05 | 2024 | Insulate bare equipment | $5,554 | $1,800 |
n/a
|
UC2417 #04 Y:2024 | 04 | 2024 | Reduce the pressure of compressed air to the minimum required | $1,301 | $75 |
n/a
|
UC2417 #03 Y:2024 | 03 | 2024 | Replace existing hvac unit with high efficiency model | $1,989 | $7,146 |
n/a
|
UC2417 #02 Y:2024 | 02 | 2024 | Optimize plant power factor | $2,644 | $9,173 |
n/a
|
UC2417 #01 Y:2024 | 01 | 2024 | Pay utility bills on time | $888 | - |
n/a
|
TT0310 #07 Y:2024 | 07 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $335 | $75 |
n/a
|
TT0310 #06 Y:2024 | 06 | 2024 | Reduce the pressure of compressed air to the minimum required | $4,799 | $60 |
n/a
|
TT0310 #05 Y:2024 | 05 | 2024 | Install occupancy sensors | $6,590 | $2,200 |
n/a
|
TT0310 #04 Y:2024 | 04 | 2024 | Optimize plant power factor | $7,227 | $9,500 |
n/a
|
TT0310 #03 Y:2024 | 03 | 2024 | Recover waste heat from equipment | $9,068 | $12,500 |
n/a
|
TT0310 #02 Y:2024 | 02 | 2024 | Install equipment (eg compactor) to reduce disposal costs | $10,414 | $17,000 |
n/a
|
TT0310 #01 Y:2024 | 01 | 2024 | Eliminate or reduce compressed air usage | $25,939 | $3,600 |
n/a
|
LE0562 #08 Y:2024 | 08 | 2024 | Use properly designed and sized hvac equipment | $13,989 | $60,600 | |
LE0562 #07 Y:2024 | 07 | 2024 | Preheat combustion air with waste heat | $3,491 | $8,000 | |
LE0562 #06 Y:2024 | 06 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $6,738 | $13,669 | |
LE0562 #05 Y:2024 | 05 | 2024 | Re-use or recycle hot or cold process exhaust air | $727 | $1,000 | |
LE0562 #04 Y:2024 | 04 | 2024 | Meter recycled water (to reduce sewer charges) | $4,836 | $5,000 | |
LE0562 #03 Y:2024 | 03 | 2024 | Use / purchase optimum sized compressor | $27,865 | $27,000 | |
LE0562 #02 Y:2024 | 02 | 2024 | Install occupancy sensors | $1,612 | $350 |