ITAC Assessment: OK1167
ITAC logo
ITAC Assessment: OK1167
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product frozen pizza crust for pizza manufacturers
NAICS 311813: Frozen Cakes, Pies, and Other Pastries Manufacturing
SIC 2053: Frozen Bakery Products, Except Bread
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area 80,000
ft2
Annual Production 10,000,000
lb
Production Hrs. Annual 1,768
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $235,446 2,226,209
kWh
Electricity Demand $66,820 8,180
kW-mo/yr
Natural Gas $11,549 1,739
MMBtu
Waste Disposal Costs
Water Usage $15,999 2,605
Tgal
Water Disposal $3,731 2,605
Tgal
TOTAL YEARLY COSTS $333,545
RECOMMENDED SAVINGS* $67,825 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $31,553 $243,360 $31,553
415,167
kWh
-
02 2.9112: Use solar heat to heat water $5,949 $248,858 - $5,949
-
MMBtu
03 2.1212: Operate boilers on high fire setting $1,182 $14,300 - $1,182
-
MMBtu
04 2.2414: Use waste heat from hot flue gases to preheat $684 $6,900 - $684
-
MMBtu
05 2.4221: Install compressor air intakes in coolest locations $639 $266 $639
8,410
kWh
-
06 2.2437: Recover waste heat from equipment $1,009 $160 - $1,009
-
MMBtu
07 2.7226: Use computer programs to optimize hvac performance $20,488 $87,500 $20,488
269,583
kWh
-
08 2.7423: Reduce heat gain by window tinting $438 $8,841 $166
2,187
kWh
$272
-
MMBtu
09 2.2437: Recover waste heat from equipment $5,883 $14,703 - $5,883
-
MMBtu
TOTAL RECOMMENDED $67,825 $624,888 $52,846
695,347
kWh
$14,979
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs