| Assessment Year | 2026 |
|---|---|
| Principal Product | frozen pizza crust for pizza manufacturers |
| NAICS | 311813: Frozen Cakes, Pies, and Other Pastries Manufacturing |
| SIC | 2053: Frozen Bakery Products, Except Bread |
| Sales Range | $5 M to 10M |
| # of Employees | 35 |
| Plant Area |
80,000
ft2
|
| Annual Production | 10,000,000
lb
|
| Production Hrs. Annual | 1,768
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $235,446 | 2,226,209 |
kWh
|
$0.11 | |
| Electricity Demand | $66,820 | 8,180 |
kW-mo/yr
|
$8.17 | |
| Natural Gas | $11,549 | 1,739 |
MMBtu
|
$6.64 | |
| Waste Disposal Costs | |||||
| Water Usage | $15,999 | 2,605 |
Tgal
|
$6.14 | |
| Water Disposal | $3,731 | 2,605 |
Tgal
|
$1.43 | |
| TOTAL YEARLY COSTS | $333,545 | ||||
| RECOMMENDED SAVINGS* | $67,825 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $31,553 | $243,360 |
$31,553
415,167
kWh
|
- | |
| 02 | 2.9112: Use solar heat to heat water | $5,949 | $248,858 | - |
$5,949
-
MMBtu
|
|
| 03 | 2.1212: Operate boilers on high fire setting | $1,182 | $14,300 | - |
$1,182
-
MMBtu
|
|
| 04 | 2.2414: Use waste heat from hot flue gases to preheat | $684 | $6,900 | - |
$684
-
MMBtu
|
|
| 05 | 2.4221: Install compressor air intakes in coolest locations | $639 | $266 |
$639
8,410
kWh
|
- | |
| 06 | 2.2437: Recover waste heat from equipment | $1,009 | $160 | - |
$1,009
-
MMBtu
|
|
| 07 | 2.7226: Use computer programs to optimize hvac performance | $20,488 | $87,500 |
$20,488
269,583
kWh
|
- | |
| 08 | 2.7423: Reduce heat gain by window tinting | $438 | $8,841 |
$166
2,187
kWh
|
$272
-
MMBtu
|
|
| 09 | 2.2437: Recover waste heat from equipment | $5,883 | $14,703 | - |
$5,883
-
MMBtu
|
|
| TOTAL RECOMMENDED | $67,825 | $624,888 |
$52,846
695,347
kWh
|
$14,979
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs