172
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Cereal breakfast foods | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| IC0220 #01 Y:2019 | 01 | 2019 | Eliminate leaks in inert gas and compressed air lines/ valves | $75,268 | $7,000 | |
| UU0137 #06 Y:2018 | 06 | 2018 | Use adjustable frequency drive or multiple speed motors on existing system | $973 | $3,500 | |
| UU0137 #05 Y:2018 | 05 | 2018 | Use adjustable frequency drive or multiple speed motors on existing system | $11,310 | $7,650 | |
| UU0137 #04 Y:2018 | 04 | 2018 | Turn off equipment during breaks, reduce operating time | $11,622 | $7,600 | |
| UU0137 #03 Y:2018 | 03 | 2018 | Recover waste heat from equipment | $26,521 | $17,000 | |
| UU0137 #02 Y:2018 | 02 | 2018 | Use adjustable frequency drive or multiple speed motors on existing system | $37,021 | $24,600 | |
| UU0137 #01 Y:2018 | 01 | 2018 | Recover waste heat from equipment | $48,448 | $23,000 | |
| IA0557 #10 Y:2016 | 10 | 2016 | Install compressor air intakes in coolest locations | $420 | $398 | |
| IA0557 #09 Y:2016 | 09 | 2016 | Reduce the pressure of compressed air to the minimum required | $461 | $35 | |
| IA0557 #08 Y:2016 | 08 | 2016 | Insulate bare equipment | $553 | $242 | |
| IA0557 #07 Y:2016 | 07 | 2016 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,648 | $189 | |
| IA0557 #06 Y:2016 | 06 | 2016 | Install / repair insulation on steam lines | $2,719 | $5,030 | |
| IA0557 #05 Y:2016 | 05 | 2016 | Install occupancy sensors | $3,284 | $5,488 | |
| IA0557 #04 Y:2016 | 04 | 2016 | Optimize plant power factor | $4,037 | $4,835 | |
| IA0557 #03 Y:2016 | 03 | 2016 | Use most efficient type of electric motors | $5,367 | $29,084 | |
| IA0557 #02 Y:2016 | 02 | 2016 | Use adjustable frequency drive or multiple speed motors on existing system | $1,548 | $500 | |
| IA0557 #01 Y:2016 | 01 | 2016 | Utilize higher efficiency lamps and/or ballasts | $44,271 | $95,210 | |
| TT0173 #15 Y:2016 | 15 | 2016 | Minimize water usage | $411 | $248 | |
| TT0173 #14 Y:2016 | 14 | 2016 | Utilize higher efficiency lamps and/or ballasts | $345 | $800 | |
| TT0173 #13 Y:2016 | 13 | 2016 | Use adjustable frequency drive or multiple speed motors on existing system | $1,965 | $4,000 |