| Assessment Year | 2018 |
|---|---|
| Principal Product | Breakfast Cereal |
| NAICS | 311230: Breakfast Cereal Manufacturing |
| SIC | 2043: Cereal Breakfast Foods |
| Sales Range | greater than $500 M |
| # of Employees | 220 |
| Plant Area |
381,600
ft2
|
| Annual Production | 130,000,000
lb
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Utah |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,930,195 | 25,602,518 |
kWh
|
$0.075 |
| Natural Gas | $1,018,839 | 291,875 |
MMBtu
|
$3.49 |
| TOTAL YEARLY COSTS | $2,949,034 | |||
| RECOMMENDED SAVINGS* | $135,895 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $87,447 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $48,448 | $23,000 |
$34,732
460,631
kWh
|
$13,716
-
MMBtu
|
|
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $37,021 | $24,600 |
$37,021
491,000
kWh
|
- | |
| 03 | 2.2437: Recover waste heat from equipment | $26,521 | $17,000 | - |
$26,521
-
MMBtu
|
|
| 04 | 2.6212: Turn off equipment during breaks, reduce operating time | $11,622 | $7,600 | - |
$11,622
-
MMBtu
|
|
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $11,310 | $7,650 |
$11,310
150,000
kWh
|
- | |
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $973 | $3,500 |
$973
12,900
kWh
|
- | |
| TOTAL RECOMMENDED | $135,895 | $83,350 |
$84,035
1,114,531
kWh
|
$51,859
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $87,447 | $60,350 |
$49,304
653,900
kWh
|
$38,143
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs