Assessment Year | 2016 |
---|---|
Principal Product | cereal |
NAICS | 311230: Breakfast Cereal Manufacturing |
SIC | 2043: Cereal Breakfast Foods |
Sales Range | $50 M to 100M |
# of Employees | 300 |
Plant Area |
500,000
ft2
|
Annual Production | 20,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,112,043 | 58,345,950 |
kWh
|
$0.036 |
Electricity Demand | $1,296,061 | 94,603 |
kW-mo/yr
|
$13.70 |
Natural Gas | $1,691,516 | 437,886 |
MMBtu
|
$3.86 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $442,607 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $92,744 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $103,506 | $2,000 |
$111,506
3,096,389
kWh
|
- | - | - | $(-8,000.0) | - | |
02 | 2.8114: Change rate schedules or other changes in utility service | $99,071 | - | - | - | - | - | - | $99,071 | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $60,623 | $598,903 |
$58,031
1,611,963
kWh
|
$2,592
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $68,525 | $200,000 |
$46,358
1,287,720
kWh
|
$24,167
-
kW-mo/yr
|
$(-2,000.0)
-
MMBtu
|
- | - | - | |
05 | 2.4151: Develop a repair/replace policy | $165 | $212 |
$108
3,007
kWh
|
$57
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $30,000 | $3,000 | - | - |
$30,000
-
MMBtu
|
- | - | - | |
07 | 2.7241: Install outside air damper / economizer on hvac unit | $41,224 | $33,600 |
$39,508
1,097,448
kWh
|
$1,716
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $16,809 | $3,900 |
$16,809
466,908
kWh
|
- | - | - | - | - | |
09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,266 | $25,000 |
$6,266
174,073
kWh
|
- | - | - | - | - | |
10 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,807 | $10,850 |
$3,601
100,039
kWh
|
$2,206
-
kW-mo/yr
|
- | - | - | - | |
11 | 2.4131: Size electric motors for peak operating efficiency | $5,769 | $4,000 |
$5,769
160,261
kWh
|
- | - | - | - | - | |
12 | 2.6218: Turn off equipment when not in use | $2,121 | $2,000 |
$2,121
58,925
kWh
|
- | - | - | - | - | |
13 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,965 | $4,000 |
$1,788
49,681
kWh
|
$177
-
kW-mo/yr
|
- | - | - | - | |
14 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $345 | $800 |
$227
6,307
kWh
|
$118
-
kW-mo/yr
|
- | - | - | - | |
15 | 3.4151: Minimize water usage | $411 | $248 |
$241
6,683
kWh
|
- | - |
$170
-
gal
|
- | - | |
TOTAL RECOMMENDED | $442,607 | $888,513 |
$292,333
8,119,404
kWh
|
$31,033
-
kW-mo/yr
|
$28,000
-
MMBtu
|
$170
-
gal
|
$(-8,000.0) | $99,071 | ||
TOTAL IMPLEMENTED | $92,744 | $603,903 |
$60,152
1,670,888
kWh
|
$2,592
-
kW-mo/yr
|
$30,000
-
MMBtu
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs