Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Grain mill products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0180 #02 Y:2021 Use waste heat from hot flue gases to preheat $8,938 $33,750
UU0180 #01 Y:2021 Optimize plant power factor $12,454 $25,000
UU0137 #06 Y:2018 Use adjustable frequency drive or multiple speed motors on existing system $973 $3,500
UU0137 #05 Y:2018 Use adjustable frequency drive or multiple speed motors on existing system $11,310 $7,650
UU0137 #04 Y:2018 Turn off equipment during breaks, reduce operating time $11,622 $7,600
UU0137 #03 Y:2018 Recover waste heat from equipment $26,521 $17,000
UU0137 #02 Y:2018 Use adjustable frequency drive or multiple speed motors on existing system $37,021 $24,600
UU0137 #01 Y:2018 Recover waste heat from equipment $48,448 $23,000
BS0085 #11 Y:2016 Insulate feedwater tank $291 $565
BS0085 #10 Y:2016 Upgrade obsolete equipment $15,075 $16,355
BS0085 #09 Y:2016 Eliminate leaks in water lines and valves $139 $16
BS0085 #08 Y:2016 Install compressor air intakes in coolest locations $145 $600
BS0085 #07 Y:2016 Upgrade controls on compressors $1,036 $2,249
BS0085 #06 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $974 $528
BS0085 #05 Y:2016 Optimize plant power factor $11,091 $13,382
BS0085 #04 Y:2016 Utilize higher efficiency lamps and/or ballasts $276 $607
BS0085 #03 Y:2016 Pay utility bills on time $348 $108
BS0085 #02 Y:2016 Utilize energy-efficient belts and other improved mechanisms $736 $390
BS0085 #01 Y:2016 Use or replace with energy efficient substitutes $679 $2,240
UU0046 #07 Y:2003 Replace city water with recycled water via cooling tower $5,727 $3,889