46
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UU0180 #02 Y:2021 | 02 | 2021 | Use waste heat from hot flue gases to preheat | $8,938 | $33,750 | |
| UU0180 #01 Y:2021 | 01 | 2021 | Optimize plant power factor | $12,454 | $25,000 | |
| UU0137 #06 Y:2018 | 06 | 2018 | Use adjustable frequency drive or multiple speed motors on existing system | $973 | $3,500 | |
| UU0137 #05 Y:2018 | 05 | 2018 | Use adjustable frequency drive or multiple speed motors on existing system | $11,310 | $7,650 | |
| UU0137 #04 Y:2018 | 04 | 2018 | Turn off equipment during breaks, reduce operating time | $11,622 | $7,600 | |
| UU0137 #03 Y:2018 | 03 | 2018 | Recover waste heat from equipment | $26,521 | $17,000 | |
| UU0137 #02 Y:2018 | 02 | 2018 | Use adjustable frequency drive or multiple speed motors on existing system | $37,021 | $24,600 | |
| UU0137 #01 Y:2018 | 01 | 2018 | Recover waste heat from equipment | $48,448 | $23,000 | |
| BS0085 #11 Y:2016 | 11 | 2016 | Insulate feedwater tank | $291 | $565 | |
| BS0085 #10 Y:2016 | 10 | 2016 | Upgrade obsolete equipment | $15,075 | $16,355 | |
| BS0085 #09 Y:2016 | 09 | 2016 | Eliminate leaks in water lines and valves | $139 | $16 | |
| BS0085 #08 Y:2016 | 08 | 2016 | Install compressor air intakes in coolest locations | $145 | $600 | |
| BS0085 #07 Y:2016 | 07 | 2016 | Upgrade controls on compressors | $1,036 | $2,249 | |
| BS0085 #06 Y:2016 | 06 | 2016 | Eliminate leaks in inert gas and compressed air lines/ valves | $974 | $528 | |
| BS0085 #05 Y:2016 | 05 | 2016 | Optimize plant power factor | $11,091 | $13,382 | |
| BS0085 #04 Y:2016 | 04 | 2016 | Utilize higher efficiency lamps and/or ballasts | $276 | $607 | |
| BS0085 #03 Y:2016 | 03 | 2016 | Pay utility bills on time | $348 | $108 | |
| BS0085 #02 Y:2016 | 02 | 2016 | Utilize energy-efficient belts and other improved mechanisms | $736 | $390 | |
| BS0085 #01 Y:2016 | 01 | 2016 | Use or replace with energy efficient substitutes | $679 | $2,240 | |
| UU0046 #07 Y:2003 | 07 | 2003 | Replace city water with recycled water via cooling tower | $5,727 | $3,889 |