ITAC Assessment: UU0180
ITAC logo
ITAC Assessment: UU0180
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Animal Feed
NAICS 311119: Other Animal Food Manufacturing
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $50
M
to 100
M
# of Employees 18
Plant Area 40,000
ft2
Annual Production 205,000
ton
Production Hrs. Annual 4,590
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,420 2,365,200
kWh
Electricity Demand $146,194 10,524
kW-mo/yr
Electricity Fees $9,108 -
Natural Gas $185,638 40,722
MMBtu
TOTAL YEARLY COSTS $422,361
RECOMMENDED SAVINGS* $44,119 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,354

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $12,454 $25,000 - - $12,454 -
02 2.2414: Use waste heat from hot flue gases to preheat $8,938 $33,750 - - - $8,938
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $7,182 $4,000 - - - $7,182
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $7,073 $13,873 $3,389
98,478
kWh
$3,684
-
kW-mo/yr
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,445 $6,445 $6,445
187,246
kWh
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $776 $126 $776
22,553
kWh
- - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $503 $503 $245
7,061
kWh
$258
-
kW-mo/yr
- -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $425 $815 $425
12,352
kWh
- - -
09 2.4231: Reduce the pressure of compressed air to the minimum required $323 $227 $126
3,666
kWh
$196
-
kW-mo/yr
- -
TOTAL RECOMMENDED $44,119 $84,739 $11,407
331,356
kWh
$4,138
-
kW-mo/yr
$12,454 $16,120
-
MMBtu
TOTAL IMPLEMENTED $15,354 $18,226 $4,291
124,697
kWh
$3,880
-
kW-mo/yr
- $7,182
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs