ITAC Assessment: BS0085
ITAC logo
ITAC Assessment: BS0085
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Animal Feed
NAICS 311119: Other Animal Food Manufacturing
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $10
M
to 50
M
# of Employees 26
Plant Area 45,000
ft2
Annual Production 48,000
ton
Production Hrs. Annual 4,160
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $28,077 699,959
kWh
Electricity Demand $73,590 4,293
kW-mo/yr
Electricity Fees $3,382 -
Natural Gas $52,540 8,830
MMBtu
LPG $7,389 699
MMBtu
Fuel Oil #4 $11,361 690
MMBtu
Waste Disposal Costs
Water Usage $5,121 732,100
Tgal
TOTAL YEARLY COSTS $181,460
RECOMMENDED SAVINGS* $30,790 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Usage Savings Primary Raw Material Savings One-time Revenue or Avoided Cost Savings
01 2.4322: Use or replace with energy efficient substitutes $679 $2,240 $182
4,539
kWh
$497
-
kW-mo/yr
- - - - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $736 $390 $736
18,354
kWh
- - - - - -
03 2.8123: Pay utility bills on time $348 $108 - - - - - - $348
04 2.7142: Utilize higher efficiency lamps and/or ballasts $276 $607 $123
3,078
kWh
$153
-
kW-mo/yr
- - - - -
05 2.3212: Optimize plant power factor $11,091 $13,382 - - $11,091 - - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $974 $528 $974
24,290
kWh
- - - - - -
07 2.4224: Upgrade controls on compressors $1,036 $2,249 $1,036
25,840
kWh
- - - - - -
08 2.4221: Install compressor air intakes in coolest locations $145 $600 $76
1,890
kWh
$69
-
kW-mo/yr
- - - - -
09 3.4154: Eliminate leaks in water lines and valves $139 $16 - - - - $139
-
Tgal
- -
10 2.4321: Upgrade obsolete equipment $15,075 $16,355 $75
1,865
kWh
- - - - $15,000 -
11 2.2123: Insulate feedwater tank $291 $565 - - - $291
-
MMBtu
- - -
TOTAL RECOMMENDED $30,790 $37,040 $3,202
79,856
kWh
$719
-
kW-mo/yr
$11,091 $291
-
MMBtu
$139
-
Tgal
$15,000 $348
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Usage Savings Primary Raw Material Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs