ITAC Assessment: UU0046
ITAC logo
ITAC Assessment: UU0046
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product pet food
NAICS 311119: Other Animal Food Manufacturing
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $50
M
to 100
M
# of Employees 180
Plant Area
n/a
Annual Production 50,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $917,866 17,202,441
kWh
Electricity Demand $377,704 531,672
kW-mo/yr
Natural Gas $516,053 216,249
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $98,965 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,686

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings
01 2.4239: Eliminate or reduce compressed air usage $16,936 $5,500 $7,824
257,028
kWh
$9,112
-
kW-mo/yr
- - -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $50,075 - - $50,075
-
kW-mo/yr
- - -
03 2.3212: Optimize plant power factor $12,187 $14,400 - - $12,187 - -
04 2.2414: Use waste heat from hot flue gases to preheat $4,186 $9,000 - - - $4,186
-
MMBtu
-
05 2.7135: Install occupancy sensors $6,168 $750 $2,461
80,835
kWh
$3,707
-
kW-mo/yr
- - -
06 2.4133: Use most efficient type of electric motors $3,686 $7,815 $2,280
74,914
kWh
$1,406
-
kW-mo/yr
- - -
07 3.4114: Replace city water with recycled water via cooling tower $5,727 $3,889 $(-1,161.0)
(-38,156)
kWh
$(-606.0)
-
kW-mo/yr
- - $7,494
-
Tgal
TOTAL RECOMMENDED $98,965 $41,354 $11,404
374,621
kWh
$63,694
-
kW-mo/yr
$12,187 $4,186
-
MMBtu
$7,494
-
Tgal
TOTAL IMPLEMENTED $3,686 $7,815 $2,280
74,914
kWh
$1,406
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs