ITAC Assessment: MS0077
ITAC logo
ITAC Assessment: MS0077
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Garments
NAICS
n/a
SIC 2321: Men's and Boys' Shirts, Except Work Shirts
Sales Range $10
M
to 50
M
# of Employees 137
Plant Area 98,000
ft2
Annual Production 5,550,000
pieces
Production Hrs. Annual 1,944
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $36,722 1,034,877
kWh
Electricity Demand $35,468 4,493
kW-mo/yr
Electricity Fees $1,187 -
Natural Gas $6,908 1,411
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,084 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $480

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.2437: Recover waste heat from equipment $588 $1,171 - $588
-
MMBtu
- - -
02 2.3212: Optimize plant power factor $291 $315 $291
-
kW-mo/yr
- - - -
03 2.6214: Shut off pilots in standby equipment $480 $20 - $480
-
MMBtu
- - -
04 3.5313: Increase amount of waste recovered for resale $1,418 - - - $1,418
-
lb
- -
05 3.5217: Reuse / recycle/ sell paper products $9,768 $11,000 - - $2,268
-
lb
- $7,500
06 3.5315: Lease / purchase baler; sell cardboard to recycler $7,539 $6,500 - - $4,139
-
lb
- $3,400
07 4.441: Install automatic packing equipment $17,000 $1,113 - - - $17,000 -
TOTAL RECOMMENDED $37,084 $20,119 $291
-
kW-mo/yr
$1,068
-
MMBtu
$7,825
-
lb
$17,000 $10,900
TOTAL IMPLEMENTED $480 $20 - $480
-
MMBtu
- - -
Yearly Savings* Imp'd Cost* Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs