Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

58

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Pickled fruits and vegetables, vegetable sauces and seasonings, and salad dressings
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0556 #08 Y:2010 Use solar heat to make electricty $16,479 $65,003
OR0556 #07 Y:2010 Eliminate or reduce compressed air usage $5,397 $11,734
OR0556 #06 Y:2010 Eliminate leaks in inert gas and compressed air lines/ valves $2,320 $2,320
OR0556 #05 Y:2010 Reduce combustion air flow to optimum $3,131 $2,861
OR0556 #04 Y:2010 Eliminate or reduce compressed air usage $8,987 $5,125
OR0556 #03 Y:2010 Optimize production lot sizes and inventories $8,900 $8,900
OR0556 #02 Y:2010 Install equipment (eg compactor) to reduce disposal costs $1,765 -
OR0556 #01 Y:2010 Utilize energy-efficient belts and other improved mechanisms $542 -
OR0475 #06 Y:2004 Make a practice of turning off lights when not needed $3,920 -
OR0475 #05 Y:2004 Turn off equipment during breaks, reduce operating time $920 -
OR0475 #04 Y:2004 Modify refrigeration system to operate at a lower pressure $9,700 -
OR0475 #03 Y:2004 Modify refrigeration system to operate at a lower pressure $3,300 -
OR0475 #02 Y:2004 Avoid frost formation on evaporators $6,600 $1,500
OR0475 #01 Y:2004 Use adjustable frequency drive or multiple speed motors on existing system $3,030 $6,920
OR0467 #04 Y:2004 Use hot process fluids to preheat incoming process fluids $46,000 $25,000
OR0467 #03 Y:2004 Modify refrigeration system to operate at a lower pressure $2,000 $31,500
OR0467 #02 Y:2004 Use filtration, centrifuging to remove contaminants $27,150 $252,000
OR0467 #01 Y:2004 Replace existing equipment with more suitable substitutes $148,000 $50
OR0360 #05 Y:1999 Sell / offer by-product as animal feed $17,520 $2,000
OR0360 #04 Y:1999 Use a less expensive method of waste removal $18,785 $67,680