| Assessment Year | 1999 |
|---|---|
| Principal Product | Soy Sauce |
| NAICS |
n/a
|
| SIC | 2035: Pickled Fruits and Vegetables, Vegetable Sauces and Seasonings, and Salad Dressings |
| Sales Range | $5 M to 10M |
| # of Employees | 28 |
| Plant Area |
42,800
ft2
|
| Annual Production | 1,696,200
Tgal
|
| Production Hrs. Annual | 2,250
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $87,403 | 2,565,358 |
kWh
|
$0.034 |
| Electricity Demand | $33,782 | 88,776 |
kW-mo/yr
|
$0.38 |
| Electricity Fees | $240 | - |
|
- |
| Natural Gas | $86,360 | 19,260 |
MMBtu
|
$4.48 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $54,047 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $29,014 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | By-product Production Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4223: Install direct acting units in place of compressed air pressure system in safety system | $9,585 | $2,840 |
$8,282
247,362
kWh
|
$1,303
-
kW-mo/yr
|
- | - | - | - | - | - | |
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,909 | - | - | - |
$1,909
-
MMBtu
|
- | - | - | - | - | |
| 03 | 2.1223: Install smaller boiler (increase high fire duty cycle) | $6,248 | $20,000 | - | - |
$6,248
-
MMBtu
|
- | - | - | - | - | |
| 04 | 3.6192: Use a less expensive method of waste removal | $18,785 | $67,680 | - | - | - |
$23,345
-
Tgal
|
$(-1,000.0)
-
lb
|
$2,290 | $(-5,850.0) | - | |
| 05 | 3.5317: Sell / offer by-product as animal feed | $17,520 | $2,000 | - | - | - | - |
$10,800
-
lb
|
- | - | $6,720 | |
| TOTAL RECOMMENDED | $54,047 | $92,520 |
$8,282
247,362
kWh
|
$1,303
-
kW-mo/yr
|
$8,157
-
MMBtu
|
$23,345
-
Tgal
|
$9,800
-
lb
|
$2,290 | $(-5,850.0) | $6,720 | ||
| TOTAL IMPLEMENTED | $29,014 | $4,840 |
$8,282
247,362
kWh
|
$1,303
-
kW-mo/yr
|
$1,909
-
MMBtu
|
- |
$10,800
-
lb
|
- | - | $6,720 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs