Assessment Year | 2009 |
---|---|
Principal Product | Men’s Tailored Clothing |
NAICS | 315220: Men’s and Boys’ Cut and Sew Apparel Manufacturing |
SIC | 2311: Men's and Boys' Suits, Coats, and Overcoats |
Sales Range | $50 M to 100M |
# of Employees | 385 |
Plant Area |
65,000
ft2
|
Annual Production | 70,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Maryland |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $232,756 | 1,709,400 |
kWh
|
$0.14 |
Natural Gas | $109,285 | 10,989 |
MMBtu
|
$9.94 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $30,945 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $27,349 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2163: Use minimum steam operating pressure | $1,091 | - | - |
$1,091
-
MMBtu
|
|
02 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $5,409 | $9,300 |
$5,409
39,480
kWh
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,789 | $16,100 |
$8,789
64,156
kWh
|
- | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,737 | $10,000 | - |
$4,737
-
MMBtu
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $580 | $80 |
$580
4,155
kWh
|
- | |
06 | 2.4224: Upgrade controls on compressors | $3,596 | $12,500 |
$3,596
26
kWh
|
- | |
07 | 2.4221: Install compressor air intakes in coolest locations | $310 | $150 |
$310
2,290
kWh
|
- | |
08 | 2.3511: Use plant owned transformers or lease transformers | $6,433 | $26,980 |
$6,433
47,304
kWh
|
- | |
TOTAL RECOMMENDED | $30,945 | $75,110 |
$25,117
157,411
kWh
|
$5,828
-
MMBtu
|
||
TOTAL IMPLEMENTED | $27,349 | $62,610 |
$21,521
157,385
kWh
|
$5,828
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs