ITAC Assessment: DL0033
ITAC logo
ITAC Assessment: DL0033
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Men’s Tailored Clothing
NAICS 315220: Men’s and Boys’ Cut and Sew Apparel Manufacturing
SIC 2311: Men's and Boys' Suits, Coats, and Overcoats
Sales Range $50
M
to 100
M
# of Employees 385
Plant Area 65,000
ft2
Annual Production 70,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $232,756 1,709,400
kWh
Natural Gas $109,285 10,989
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,945 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,349

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2163: Use minimum steam operating pressure $1,091 - - $1,091
-
MMBtu
02 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $5,409 $9,300 $5,409
39,480
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,789 $16,100 $8,789
64,156
kWh
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $4,737 $10,000 - $4,737
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $580 $80 $580
4,155
kWh
-
06 2.4224: Upgrade controls on compressors $3,596 $12,500 $3,596
26
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $310 $150 $310
2,290
kWh
-
08 2.3511: Use plant owned transformers or lease transformers $6,433 $26,980 $6,433
47,304
kWh
-
TOTAL RECOMMENDED $30,945 $75,110 $25,117
157,411
kWh
$5,828
-
MMBtu
TOTAL IMPLEMENTED $27,349 $62,610 $21,521
157,385
kWh
$5,828
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs