| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OR0802 #04 Y:2024 | 04 | 2024 | Replace boiler | $37,073 | $222,038 | |
| OR0802 #03 Y:2024 | 03 | 2024 | Reduce the pressure of compressed air to the minimum required | $1,483 | $499 | |
| OR0802 #02 Y:2024 | 02 | 2024 | Insulate bare equipment | $2,952 | $500 | |
| OR0802 #01 Y:2024 | 01 | 2024 | Eliminate or reduce compressed air usage | $1,248 | $147 | |
| OR0377 #04 Y:2000 | 04 | 2000 | Eliminate practice of mixing waste streams | $108,000 | $40,000 | |
| OR0377 #03 Y:2000 | 03 | 2000 | Replace city water with recycled water via cooling tower | $97,815 | $113,670 | |
| OR0377 #02 Y:2000 | 02 | 2000 | Change procedures / equipment / operating conditions | $1,345,966 | $600,000 | |
| OR0377 #01 Y:2000 | 01 | 2000 | Reduce the pressure of compressed air to the minimum required | $3,486 | - | |
| OR0070 #08 Y:1989 | 08 | 1989 | Optimize plant power factor | $1,625 | $3,450 | |
| OR0070 #07 Y:1989 | 07 | 1989 | Analyze flue gas for proper air/fuel ratio | $1,260 | $2,000 | |
| OR0070 #06 Y:1989 | 06 | 1989 | Install compressor air intakes in coolest locations | $232 | $250 | |
| OR0070 #05 Y:1989 | 05 | 1989 | Use most efficient type of electric motors | $1,113 | $1,204 | |
| OR0070 #04 Y:1989 | 04 | 1989 | Modify refrigeration system to operate at a lower pressure | $8,766 | - | |
| OR0070 #03 Y:1989 | 03 | 1989 | Preheat boiler makeup water with waste process heat | $3,909 | $1,090 | |
| OR0070 #02 Y:1989 | 02 | 1989 | Eliminate leaks in water lines and valves | $12,697 | $2,400 | |
| OR0070 #01 Y:1989 | 01 | 1989 | Eliminate leaks in water lines and valves | $13,228 | $2,500 | |
| OR0043 #07 Y:1988 | 07 | 1988 | Use waste heat from hot flue gases to preheat | $5,196 | $12,635 | |
| OR0043 #06 Y:1988 | 06 | 1988 | Optimize plant power factor | $2,458 | $5,400 | |
| OR0043 #05 Y:1988 | 05 | 1988 | Install / repair insulation on condensate lines | $433 | $908 | |
| OR0043 #04 Y:1988 | 04 | 1988 | Install / repair insulation on steam lines | $1,477 | $1,900 |