ITAC Assessment: OR0043
ITAC logo
ITAC Assessment: OR0043
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product POTATO FLAKES & STARCH
NAICS
n/a
SIC 2034: Dried and Dehydrated Fruits, Vegetables, and Soup Mixes
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area
n/a
Annual Production 24,000,000
lb
Production Hrs. Annual 6,552
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $182,468 2,920,574
kWh
LPG $210,439 53,626
MMBtu
Fuel Oil #4 $118,728 47,382
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,712 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,045

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Fuel Oil #4 Savings
01 2.2163: Use minimum steam operating pressure $506 - - $324
-
MMBtu
$182
-
MMBtu
02 2.4133: Use most efficient type of electric motors $471 $258 $471
7,620
kWh
- -
03 2.2511: Insulate bare equipment $1,171 $627 - $749
-
MMBtu
$422
-
MMBtu
04 2.2136: Install / repair insulation on steam lines $1,477 $1,900 - $947
-
MMBtu
$530
-
MMBtu
05 2.2122: Install / repair insulation on condensate lines $433 $908 - $277
-
MMBtu
$156
-
MMBtu
06 2.3212: Optimize plant power factor $2,458 $5,400 $2,458
-
kWh
- -
07 2.2414: Use waste heat from hot flue gases to preheat $5,196 $12,635 - $3,324
-
MMBtu
$1,872
-
MMBtu
TOTAL RECOMMENDED $11,712 $21,728 $2,929
7,620
kWh
$5,621
-
MMBtu
$3,162
-
MMBtu
TOTAL IMPLEMENTED $6,045 $8,835 $2,458
-
kWh
$2,297
-
MMBtu
$1,290
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Fuel Oil #4 Savings