ITAC Assessment: UM0213
ITAC logo
ITAC Assessment: UM0213
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Ball Bearings
NAICS
n/a
SIC 3399: Primary Metal Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 369
Plant Area 173,300
ft2
Annual Production 22,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $532,106 18,391,200
kWh
Electricity Demand $796,382 43,512
kW-mo/yr
Natural Gas $331,086 67,549
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $145,654 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $104,749

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $40,905 $1,000 $40,905
2,445,964
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $35,927 $71,714 $18,721
665,975
kWh
$17,206
-
kW-mo/yr
-
03 2.7221: Lower temperature during the winter season and vice-versa $23,514 $500 - - $23,514
-
MMBtu
04 2.4239: Eliminate or reduce compressed air usage $22,460 $3,600 $6,100
216,989
kWh
$16,360
-
kW-mo/yr
-
05 2.7132: Install timers on light switches in little used areas $11,201 $500 $11,201
397,488
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,292 $3,000 $5,363
190,787
kWh
$4,929
-
kW-mo/yr
-
07 2.7447: Install vinyl strip / high speed / air curtain doors $1,355 $1,468 $297
3,516
kWh
- $1,058
-
MMBtu
TOTAL RECOMMENDED $145,654 $81,782 $82,587
3,920,719
kWh
$38,495
-
kW-mo/yr
$24,572
-
MMBtu
TOTAL IMPLEMENTED $104,749 $80,782 $41,682
1,474,755
kWh
$38,495
-
kW-mo/yr
$24,572
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs