Assessment Year | 2000 |
---|---|
Principal Product | Dehydrated Potato Flakes |
NAICS |
n/a
|
SIC | 2034: Dried and Dehydrated Fruits, Vegetables, and Soup Mixes |
Sales Range | $10 M to 50M |
# of Employees | 77 |
Plant Area |
50,000
ft2
|
Annual Production | 38,435,809
lb
|
Production Hrs. Annual | 37,680
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $230,664 | 8,427,022 |
kWh
|
$0.027 |
Electricity Demand | $63,894 | 214,956 |
kW-mo/yr
|
$0.30 |
Electricity Fees | $9,519 | - |
|
- |
Natural Gas | $1,014,525 | 385,209 |
MMBtu
|
$2.63 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,555,267 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $108,000 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Water Consumption Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,486 | - |
$2,937
109,906
kWh
|
$549
-
kW-mo/yr
|
- | - | - | - | - | |
02 | 3.1191: Change procedures / equipment / operating conditions | $1,345,966 | $600,000 | - | - |
$(-229,234.0)
-
MMBtu
|
- | $(-290,400.0) | - | $1,865,600 | |
03 | 3.4114: Replace city water with recycled water via cooling tower | $97,815 | $113,670 |
$(-19,709.0)
(-737,397)
kWh
|
$(-3,686.0)
-
kW-mo/yr
|
- |
$86,200
-
Tgal
|
- |
$35,010
-
Tgal
|
- | |
04 | 3.1291: Eliminate practice of mixing waste streams | $108,000 | $40,000 | - | - | - |
$108,000
-
Tgal
|
- | - | - | |
TOTAL RECOMMENDED | $1,555,267 | $753,670 |
$(-16,772.0)
(-627,491)
kWh
|
$(-3,137.0)
-
kW-mo/yr
|
$(-229,234.0)
-
MMBtu
|
$194,200
-
Tgal
|
$(-290,400.0) |
$35,010
-
Tgal
|
$1,865,600 | ||
TOTAL IMPLEMENTED | $108,000 | $40,000 | - | - | - |
$108,000
-
Tgal
|
- | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs