ITAC Assessment: OR0377
ITAC logo
ITAC Assessment: OR0377
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Dehydrated Potato Flakes
NAICS
n/a
SIC 2034: Dried and Dehydrated Fruits, Vegetables, and Soup Mixes
Sales Range $10
M
to 50
M
# of Employees 77
Plant Area 50,000
ft2
Annual Production 38,435,809
lb
Production Hrs. Annual 37,680
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $230,664 8,427,022
kWh
Electricity Demand $63,894 214,956
kW-mo/yr
Electricity Fees $9,519 -
Natural Gas $1,014,525 385,209
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,555,267 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $108,000

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Water Consumption Savings By-product Production Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $3,486 - $2,937
109,906
kWh
$549
-
kW-mo/yr
- - - - -
02 3.1191: Change procedures / equipment / operating conditions $1,345,966 $600,000 - - $(-229,234.0)
-
MMBtu
- $(-290,400.0) - $1,865,600
03 3.4114: Replace city water with recycled water via cooling tower $97,815 $113,670 $(-19,709.0)
(-737,397)
kWh
$(-3,686.0)
-
kW-mo/yr
- $86,200
-
Tgal
- $35,010
-
Tgal
-
04 3.1291: Eliminate practice of mixing waste streams $108,000 $40,000 - - - $108,000
-
Tgal
- - -
TOTAL RECOMMENDED $1,555,267 $753,670 $(-16,772.0)
(-627,491)
kWh
$(-3,137.0)
-
kW-mo/yr
$(-229,234.0)
-
MMBtu
$194,200
-
Tgal
$(-290,400.0) $35,010
-
Tgal
$1,865,600
TOTAL IMPLEMENTED $108,000 $40,000 - - - $108,000
-
Tgal
- - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs