Assessment Year | 2024 |
---|---|
Principal Product | Powdered corn |
NAICS | 311423: Dried and Dehydrated Food Manufacturing |
SIC | 2034: Dried and Dehydrated Fruits, Vegetables, and Soup Mixes |
Sales Range | $10 M to 50M |
# of Employees | 45 |
Plant Area |
48,000
ft2
|
Annual Production | 2,790,000
lb
|
Production Hrs. Annual | 5,208
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $102,801 | 1,599,900 |
kWh
|
$0.064 |
Electricity Demand | $60,782 | 4,324 |
kW-mo/yr
|
$14.06 |
Electricity Fees | $16,463 | - |
|
- |
Natural Gas | $223,379 | 25,444 |
MMBtu
|
$8.78 |
TOTAL YEARLY COSTS | $403,425 | |||
RECOMMENDED SAVINGS* | $77,847 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4239: Eliminate or reduce compressed air usage | $50,020 | $5,000 |
$50,020
778,525
kWh
|
- | - | |
02 | 2.4239: Eliminate or reduce compressed air usage | $1,248 | $147 |
$1,248
19,428
kWh
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,482 | $499 |
$983
15,303
kWh
|
$499
-
kW-mo/yr
|
- | |
04 | 2.2511: Insulate bare equipment | $1,009 | $280 | - | - |
$1,009
-
MMBtu
|
|
05 | 2.1223: Install smaller boiler (increase high fire duty cycle) | $24,088 | $10,281 |
$4,242
66,021
kWh
|
- |
$19,846
-
MMBtu
|
|
TOTAL RECOMMENDED | $77,847 | $16,207 |
$56,493
879,277
kWh
|
$499
-
kW-mo/yr
|
$20,855
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs