ITAC Assessment: OR0802
ITAC logo
ITAC Assessment: OR0802
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Powdered corn
NAICS 311423: Dried and Dehydrated Food Manufacturing
SIC 2034: Dried and Dehydrated Fruits, Vegetables, and Soup Mixes
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 48,000
ft2
Annual Production 2,790,000
lb
Production Hrs. Annual 5,208
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $102,801 1,599,900
kWh
Electricity Demand $60,782 4,324
kW-mo/yr
Electricity Fees $16,463 -
Natural Gas $223,379 25,444
MMBtu
TOTAL YEARLY COSTS $403,425
RECOMMENDED SAVINGS* $42,755 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4239: Eliminate or reduce compressed air usage $1,248 $147 $1,248
19,428
kWh
- -
02 2.2511: Insulate bare equipment $2,952 $500 - - $2,952
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,483 $499 $983
15,303
kWh
$499
-
kW-mo/yr
-
04 2.1224: Replace boiler $37,073 $222,038 $4,583
71,332
kWh
$668
-
kW-mo/yr
$31,821
-
MMBtu
TOTAL RECOMMENDED $42,755 $223,184 $6,815
106,063
kWh
$1,168
-
kW-mo/yr
$34,773
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs