ITAC Assessment: LE0539
ITAC logo
ITAC Assessment: LE0539
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Medical Diagnostics solutions
NAICS 325413: In-Vitro Diagnostic Substance Manufacturing
SIC 2835: In Vitro and In Vivo Diagnostic Substances
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 190,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 3,000
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $508,984 10,043,042
kWh
Electricity Demand $84,339 17,070
kW-mo/yr
Electricity Fees $112,433 -
Natural Gas $20,272 2,161
MMBtu
TOTAL YEARLY COSTS $726,028
RECOMMENDED SAVINGS* $43,977 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,572

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7263: Lower compressor pressure through a/c system modification $136 $40 $98
1,924
kWh
$38
-
kW-mo/yr
-
02 2.7261: Install timers and/or thermostats $3,105 $1,650 $1,660
32,558
kWh
- $1,445
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,436 $6,624 $2,478
48,576
kWh
$958
-
kW-mo/yr
-
04 2.7232: Replace existing hvac unit with high efficiency model $37,300 $127,125 $32,918
645,449
kWh
$4,382
-
kW-mo/yr
-
TOTAL RECOMMENDED $43,977 $135,439 $37,154
728,507
kWh
$5,378
-
kW-mo/yr
$1,445
-
MMBtu
TOTAL IMPLEMENTED $3,572 $6,664 $2,576
50,500
kWh
$996
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs